Get Your Personalized Samsung Heat Pump Estimate & Savings

*Get a personalized estimate. No spam, just real numbers.

Decorative
Unmatched Expertise

With our team of seasoned home comfort advisors.

Decorative
Satisfaction Guaranteed

When you experience our customer-oriented service.

red seal certified icon
Red Seal Certified

Every install is performed by certified technicians.

Backed by a full suite of HVAC Units

WindFree™ 2.0
9K / 12K / 18K / 24K

a white rectangular object with a paper towel dispenser
9,000 BTU/H - 24,000 BTU/H
Residential HVAC system
high heating output at -22°F
InfoHub (optional)
7  warranty on parts & labor
WINDFREETM 2.0 Series Single-Zone Info

Quantum 2.0
9K / 12K / 18K / 24K

Max Heat® 2.0 Samsung Product
9,000 BTU/H - 24,000 BTU/H
-30c cold climate rated
InfoHub (optional)
7  warranty on parts & labor
QUANTUM 2.0 Series Multi-Zone Info

Max Heat® 2.0
9k/ 12k / 18k / 24k

a white device with a circular fan
9,000 BTU/H - 24,000 BTU/H
-25c cold climate rated
InfoHub (optional)
7  warranty on parts & labor
QUANTUM 2.0 Series Multi-Zone Info
How It works

How Long Does Heat Pump Installation Take? What’s the Process?

Greenfoot Energy’s heat pump installation process typically takes 1-3 weeks from initial consultation to completed installation. Same-day installation is possible for single-zone systems once equipment arrives.

01
STEP 01
Free In-Home Heat Pump Consultation

A certified advisor visits your home to:

  • Assess heating/cooling requirements (room-by-room load calculation)
  • Evaluate electrical capacity (dedicated 240V circuit check)
  • Identify optimal indoor and outdoor unit locations
  • Discuss equipment options and brand preferences
  • Provide detailed written quote with specs and pricing
  • Explain available rebates and financing options

Cost: Free, no obligation | Timeline: 3-5 business days

02
STEP 02
Quote Review & Equipment Ordering

Once you approve the quote:

  • Equipment ordered from supplier (typically in stock)
  • Installation date scheduled based on your availability
  • Electrical permit obtained if required
  • Pre-installation checklist provided
Cost: Free, no obligation
Timeline: 3-7 business days
03
STEP 03
Professional Heat Pump Installation

Certified technicians handle everything from mounting to commissioning:

  • Mount indoor and outdoor units
  • Refrigerant line penetration and electrical connection
  • Condensate drain line installation
  • Vacuum test and refrigerant charging
  • Full system startup and testing
  • Complete cleanup and debris removal
Single-Zone: 4-8 hours
Multi-Zone: 2-3 days
04
STEP 04
System Training & Demonstration

Your technician provides hands-on training:

  • Remote control operation (heat, cool, auto, dry)
  • Temperature settings and energy-saving features
  • Filter cleaning demonstration
  • Maintenance schedule review
Cost: Free, no obligation
Timeline: 3-5 business days
Clik and Design here
daikin blue logoLG logoGridless-logo-darkDecorativeDecorative
daikin blue logoLG logoGridless-logo-darkDecorativeDecorative
daikin blue logoLG logoGridless by Hisense logoDecorativeDecorative