Get Your Personalized Samsung Heat Pump Estimate & Savings

*Get a personalized estimate. No spam, just real numbers.
SAVINGS CALCULATOR*
Get Your Free Assessment

Thank you! Your submission has been received!

Oops! Something went wrong while submitting the form.

Decorative
Unmatched Expertise

With our team of seasoned home comfort advisors.

Decorative
Satisfaction Guaranteed

When you experience our customer-oriented service.

red seal certified icon
Red Seal Certified

Every install is performed by certified technicians.

Backed by a full suite of HVAC Units

WindFree™ 2.0
9K / 12K / 18K / 24K

a white rectangular object with a paper towel dispenser
9,000 BTU/H - 24,000 BTU/H
Residential HVAC system
high heating output at -22°F
InfoHub (optional)
7  warranty on parts & labor
WINDFREETM 2.0 Series Single-Zone Info

Quantum 2.0
9K / 12K / 18K / 24K

Max Heat® 2.0 Samsung Product
9,000 BTU/H - 24,000 BTU/H
-30c cold climate rated
InfoHub (optional)
7  warranty on parts & labor
QUANTUM 2.0 Series Multi-Zone Info

Max Heat® 2.0
9k/ 12k / 18k / 24k

a white device with a circular fan
9,000 BTU/H - 24,000 BTU/H
-25c cold climate rated
InfoHub (optional)
7  warranty on parts & labor
QUANTUM 2.0 Series Multi-Zone Info
How It works

How Long Does Heat Pump Installation Take? What’s the Process?

Greenfoot Energy’s heat pump installation process typically takes 1-3 weeks from initial consultation to completed installation. Same-day installation is possible for single-zone systems once equipment arrives.

01
STEP 01
Free In-Home Heat Pump Consultation

A certified advisor visits your home to:

  • Assess heating/cooling requirements (room-by-room load calculation)
  • Evaluate electrical capacity (dedicated 240V circuit check)
  • Identify optimal indoor and outdoor unit locations
  • Discuss equipment options and brand preferences
  • Provide detailed written quote with specs and pricing
  • Explain available rebates and financing options

Cost: Free, no obligation | Timeline: 3-5 business days

02
STEP 02
Quote Review & Equipment Ordering

Once you approve the quote:

  • Equipment ordered from supplier (typically in stock)
  • Installation date scheduled based on your availability
  • Electrical permit obtained if required
  • Pre-installation checklist provided
Cost: Free, no obligation
Timeline: 3-7 business days
03
STEP 03
Professional Heat Pump Installation

Certified technicians handle everything from mounting to commissioning:

  • Mount indoor and outdoor units
  • Refrigerant line penetration and electrical connection
  • Condensate drain line installation
  • Vacuum test and refrigerant charging
  • Full system startup and testing
  • Complete cleanup and debris removal
Single-Zone: 4-8 hours
Multi-Zone: 2-3 days
04
STEP 04
System Training & Demonstration

Your technician provides hands-on training:

  • Remote control operation (heat, cool, auto, dry)
  • Temperature settings and energy-saving features
  • Filter cleaning demonstration
  • Maintenance schedule review
Cost: Free, no obligation
Timeline: 3-5 business days
Clik and Design here
daikin blue logoLG logoGridless-logo-darkDecorativeDecorative
daikin blue logoLG logoGridless-logo-darkDecorativeDecorative
daikin blue logoLG logoGridless by Hisense logoDecorativeDecorative